
At E.D. Products Limited we have invested a great deal of time and money in founding a systematic and efficient Electronic/Engineering system.

Stringent three-stage (FAI/PPAP, first-off, final) quality inspection process ensures that both pre-process and post-process errors are addressed quickly and efficiently.

All crimp terminations are checked for post-crimp height conformance (as per mfg’s specs) and destructive pull test (as per UL/MIL)- up to 2000lbs!

All harness and cable assemblies are produced on electronic harness boards and checked with programmable ‘cable scanners’ for 100% electrical continuity and point-to-point verification.

